Xinyouyuan (Dongguan) supplies silica-sol investment castings (lost-wax) produced by partner foundries in Guangdong, with larger castings available through a partner foundry in Hebei. We focus on small, technical parts where dimensional consistency, surface finish and lot-to-lot traceability matter — typically 9 g to 526 g per casting, in lots from trial quantities to multi-tonne orders.
Process
Pattern (medium-temperature wax) → pattern assembly → 4.5-layer silica-sol shell (face coat + 4 coats + seal) → steam dewaxing → shell firing → medium-frequency induction melting → pouring → knockout / gate cutting → gate grinding → shot blasting → pickling & passivation → dimensional & visual inspection → optional welding repair / dressing / straightening → packing.
Materials
| Status | Grades |
|---|---|
| In production (verified) | 304, 201, 316, 303 stainless |
| In production (order records) | 45#, 40Cr, A3, 1018 carbon / low-alloy steels |
| Evaluated per drawing | CF8 / CF8M, 316L, duplex (2205 / CD3MN), 17-4PH, nickel- and cobalt-based grades — evaluation and sampling first; no production record yet. |
Size & weight
- Investment castings: 9 g – 526 g per piece (verified on current production records); parts around 0.5 kg quoted; single pieces above 0.5 kg are reviewed per drawing (not yet in series production).
- Large castings: up to approx. 1 t via a partner foundry in Hebei — process route to be confirmed; this is not investment casting.
- Typical envelope up to approx. 100–150 mm (example part 126 × 85 × 67 mm); larger sizes evaluated per drawing.
Tolerances
- Typical casting tolerance CT5–CT7 (ISO 8062), confirmed per drawing and first article.
- Machining allowance 1 mm per side (1–1.2 mm) where machining is required.
- Tighter tolerance bands are evaluated per drawing and first article; extra cost and lead time apply.
Quality & inspection
- Spectrochemical analysis every heat (direct-reading optical emission spectrometer) — a per-heat composition report is provided with each lot.
- Dimensional records: first-article, in-process and final inspection with standard gauges.
- Third-party testing (NDT, metallography, mechanical properties, salt spray) can be discussed and quoted per project — not performed in-house.
- No ISO 9001 certificate is held; documented procedures and records are maintained in line with ISO 9001 requirements. EN 10204 3.1 is not offered as standard (third-party verification can be quoted per project).
- No CMM reports, no full PPAP / AS9100 packages.
Capacity & lead time
- Planning volume approx. 6.5 t of steel / 360,000–390,000 pcs per month across 80–95 active part numbers (Jan–Apr 2026 records; planning basis, confirmed per order).
- Repeat orders: typically 2–4 weeks after PO and drawing confirmation (2026 records: 4–36 days, median ~12 days; confirmed per order).
- New parts: tooling and sampling add time — plan on approx. 5–7 weeks from drawing approval to first production lot (confirmed per project).
Sampling
- 1–3 pcs for standard / existing-tool parts, freight collect; new / custom parts sampled at cost, credited against the first production order.
- Sample lead time: 7–10 days with existing tooling; 18–25 days with new tooling.
- Tooling is quoted separately and 100% prepaid (not amortised into unit price). Tooling remains the seller’s property until fully paid.
What we do not offer / limits
- Single-piece investment castings above 0.5 kg — not yet in series production (evaluated and sampled per project).
- Large castings (up to ~1 t) — partner foundry in Hebei, process to be confirmed (not investment casting).
- In-house NDT / metallography / mechanical testing / CMM — third-party only.
- EN 10204 3.1, PPAP / AS9100, ISO 9001 certification — not offered.
- Duplex, 17-4PH, nickel / cobalt and high-temperature alloys — evaluated per drawing; no production record.
Send a drawing — get a quote and a DFM note within 2 business days. 13% VAT invoice available.