Buyers who need a second source, a trial run before volume, or a supplier for slow-moving SKUs — without committing to a large order. Typical runs are 200–5,000 pieces per item; smaller trial lots can be discussed.




Is 200–5,000 feasible?
Yes, within our verified range: current order records include runs from tens of pieces to several thousand per item, and monthly planning covers 80–95 active part numbers. For parts above 5,000 pcs, volume is quoted per project (capacity exists; scheduling is confirmed per order).
What drives changeover cost
- Tooling: one-off, quoted separately, 100% prepaid; historical domestic tooling prices were approx. RMB 2,500–3,000 per mould; current quotations are confirmed per part (hand mould vs semi-automatic multi-cavity).
- Machine set-up: changing a mould and re-setting the wax press takes roughly 1–4 hours by shop records — no production line rebuild is needed for a small batch.
- Sampling: see below; sampling cost is credited against the first production order.
Sampling process
- Drawing and technical review; process route and tooling proposal.
- Temporary work instruction prepared and approved before trial.
- Tooling built / repaired and verified; wax patterns from every cavity checked and recorded.
- At least two pattern-assembly options trialled; shell, dewaxing, firing and pouring tracked.
- Castings sectioned; internal soundness checked; photos and records kept.
- Cleaning, dimensional check; machining coordination where required.
- Sample report issued (dimension, marking, material, properties as agreed).
- First three production heats tracked and verified before hand-over to series production.
Lead time
- Repeat orders (existing tooling): typically 2–4 weeks after PO, confirmed per order.
- New parts: approx. 5–7 weeks from drawing approval to first production lot (confirmed per project).
- Samples: 7–10 days with existing tooling; 18–25 days with new tooling.
What we do not accept
- Single-piece investment castings above 0.5 kg — no series record; may be evaluated and sampled per project, but not quoted as standard.
- Orders requiring ISO 9001 certification, EN 10204 3.1, PPAP or AS9100 as a standard deliverable.
Send a drawing — get a quote and a DFM note within 2 business days.